Marva's Mansion
(A work in progress)


This is a custom built house that Steve is working on for a customer of ours. It is 80" from side to side, 24" from front to back and 35" from top to bottom. I will be adding pictures of the progress on the house every week or so. Keep coming back to see how it is coming along. I think you will be very impressed.
Some of you who have been here before may have noticed that I enlarged most of the pictures to show more detail


These first two pictures show the completed shell of the house without the roof. The windows and doors are in place temporarily to check for fit. You can already tell what a great house this is going to be.

These next two pictures show the addition of the top floor on the main part of the house and roofs on all sections. Again, most of the windows and doors are in place temporarily.

With these two pictures, you can really see the house shaping up. The shingles have been added to the roof, decorative trim has been added along the roofline and the painting has been started. Once again, the windows and doors are just in temporarily.

Here you see that the shingles have been painted. Next we'll be starting on the windows.

Now most of the windows have been added, as well as decorative shutters and trim around the tops of the roofs.

Here the doors have been added and the outside of the house is nearly complete.

This is the last picture for now. The outside of the structure is completely finished. All doors, windows and lights have been added.

Be sure to look for pictures of the inside of this house. So far the wiring has been laid, but that is it. Once a bit more of the inside gets done, we'll have more pictures to show you.